Contingency Sums are the sums preserved for the civil expenditures or works that cannot be estimated at the time the tender documents are issued which the Sums may include provision for work to be executed or for services or materials to be supplied by a Nominated Sub-contractor. The Contingency Sums can be used during the construction stage and the design stage of the civil works.
Usually, the Contingency Sums are used to cover the extra cost caused by the unpredictable or additional civil works and site works. A reasonable Contingency Sums to be allowed would be 5 to 10% of the budget for the new construction, and up to 20% for addition or renovation projects.
There are few types of Contingency Sums. The Contingency Sums can be some
…show more content…
Provisional sums provide different forms in contract with different ways, and some forms of contract can be a little vague about how provisional sums should be presented, in particular regarding adjustments to the programme.
The Provisional sums can place either the client or the contractor at the risk of unexpected delays or costs. The agreement the cost of such civil works or extensions of time that might be claimed can result in negotiating between the client and the contractor. They should only be used as a last resort, they should not be an easy fall-back position for consultants when the civil designs are not completed or information is not enough.
Contingency Sums are often used in the following two reasons.
The design contingency, in the design stage when many aspects of the civil project are not finalized or not completely understood the Contingency Sums will be higher as a proportion of the total budget. The architect should provide a practical estimation of the budget for the civil project, cost planning, and the establishment of a project budget at the commencement of the civil works, is a specialist professional service more usually offered by a quantity
Homework 5 Chapter 5 Question P4. a.) Answer. Lets represent the decimal numbers into the binary first 1 = 0001 2 = 0010 3 = 0011 4 = 0100 5 = 0101 6 = 0110 7 = 0111 8 = 1000 9 = 1001 10 = 1010 Lets take 16 bits and calculate the check sum
Introduction The purpose of this report is to summarize what our team, the Fig Neutrons, did for the final project of ECE160. For the project we used an Arduino Sparkfun Kit to build a Simon says game with multiple game modes that would display several different game statistics on an LCD screen. The work the team has done includes Charlieplexing LEDs and including code for implementing the LEDs, writing code for a reverse Simon game. We also had to make the game play a different song than the one provided, and write code for the LCD to display wins, losses, game length, and the number of games played.
2. Estimating and budgeting is made easier. Before you start drawing a plan you are required to input types of materials you will be using, types of nails, and County Building Codes. This allows Chief Architect to track how much material is needed, what type of material, how many nails, how much drywall, insulation, and much more. This feature alone will have our company thousands of dollars.
1. 31 counties, 2551652 is total 2010 population, Washington county in Arkansas has largest area of 956.1 square miles 2. New York has largest number of African Americans, District of Columbia (DC) has largest percen tage of African Americans 3. Middle Atlantic has 3014385 4. - FIPS code is the field that can use to join table with dating table.
There was not enough information to calculate capital expenditures that associated with the implement of new
Professional Services Agreement Exhibit A Monthly Project Report Content (if applicable to Services) Include: Project Name, Project Manager, Reporting Period and Date Completed. Section 1 – General Information Project Status (% complete for each phase) – Pre-Planning and Programming, Design, Construction, and Close-Out. Indicate (1) design firm, (2) contractor/builder and (3) other key consultants. Section 2 – Milestone Schedule Attach a milestone schedule for the full project. Include at a minimum the following: (1) Phases of the project – pre-planning and programming, design phase(s), agency approvals, bidding, builder selection, construction phase and close-out.
Throughout the night, Mary dreamt of Bill . Her mind raced through memories from the first time their eyes met, how those sweet blue eyes sparkled when he laughed, and how they were in love and drifted apart. She also remembered 4 years ago, when she had seen him while away on business in Orlando, Florida. She thought it had been destiny at the time, seeing each other thousands of miles away from their original homes and being in the same hotel.
Justina Toland- Tennant Unit 4 Assignment Chapter 4 Exercises and Review Chapter 4: Exercise 4.26 #4 49521 Hernia repair, inguinal, incarcerated Chapter 4: Exercise 4.31 #4 50920 Fistula, closure, ureter cutaneous Chapter 4: Exercise 4.34 #10 54322 Hypospadias, repair, one stage, meatal advancement Chapter 4: Exercise 4.37 #8 58956 Hysterectomy, abdominal, total Chapter 4: Exercise 4.41 #4 61312 Craniotomy, evacuation of hematoma Chapter 4: Exercise 4.43 #8 67700-RT Incision and drainage, abscess, eyelid Chapter 4: Review: Coding for Facility # 12 11305-LT Shaving, skin lesion Appendix C: Case Number #9 52630 Prostatectomy, transurethral 9. 52601 Prostate, excision, transurethral; or Prostatectomy,
Various benefits exist in making financial projections on pro forma statements. One of such benefit is that it helps to minimize the risk associated with starting a project without looking at the alternative. For example, Alice had a choice of going to Vegas to make it big, but then she knew the consequences of winning and losing. However, with her assumptions and projections, all pro forma statements gave her a clear view of where she would be based on her choice. Whatever decision she takes becomes her responsibility and the consequences she must bear.
Any modification to a construction contract after a contract award is called a change order. Contractors will receive the package of the contract in the form of drawings, plans, equipments lists and various other documents. Then, the contractor should be able to calculate the labor cost, material cost, and schedule based on the original package that they received. Changes can be initiated by all parties in the construction process. All changes, however, must be approved by the owner before implementation.
Neff Said: Mise-en-scene and Sound in Double Indemnity Film Noir is a genre filled with many interesting conventions. The films within Film Noir use narration, performance, lighting, and blocking in order to tell tales of murder, betrayal, and questionable morals.
a. Strengths GameStop is a market leader in video games and related hardware. Owing to this leadership, it has significant profit margin until it dropped this year. Also, it has an expansive of distribution network with thousands of stores globally. Cash surplus is likewise available, enabling expansion.
Introduction In today’s world, most developing countries are in a race to build up the necessary infrastructure to scale up there operations and become the next global superpower. In this process, a lot of energy is consumed – be it for transportation, manufacturing or construction. This rapid growth of energy use seen over the past two decades have raised concerns for governments and energy-related organizations alike. Questions with regard to the supply, sustainability and exhaustion of energy sources abound, and while most developed countries have taken active steps to reduce consumption of scarce resources, the position of developing countries in this regard is still lacking.
Tort of negligence is the failure to act as a reasonable person to exercise the standard of care required by the law and resulting in damage to the party to whom the duty was owed. To prove negligence, the claimant must show that the defendant causing the damage was not only the actual cause of damage. He also show that the proximate cause of the damage. Proximity is the legal relationship between the parties from which the law will attribute a duty of care. And to prove negligence the type of the damage that occurred must have been foreseeable.
These assessments are often poor. Alternatives put forward tend to be unrealistic in order to favour the option the applicant wants to implement. The regulations also require the applicant to illustrate the need and desirability of the project, which is often not done (Hutton and Tefford, 2003). Impact mitigation Insufficient information provided on recommended mitigation measures; little indication of the practicality, reliability and potential effectiveness of the mitigation measures and problems with measures which are recommended that don’t address identified impacts.