Nt1330 Unit 3 Assignment 1-3

149 Words1 Page

Cat & Ram, Were you able to locate any of the existing demo dongles? If not, I can provide new dongles. Let me know how we should proceed. We would also like to recommend that 1-2 people from transmission planning come to Electrocon for 2-3 days of training. It would be good for them to be accompanied by one protection engineer who has previously worked with CAPE during the evaluation period and attended the CAPE UGM training sessions. In order for CAPE-TS Link to work, we will need to not only convert your network to CAPE, but protection data will need to be entered for the area to be studied. If there is any NDA that needs to be signed between Entergy and Electrocon, this might be a good time to get that NDA in place to make it easier

More about Nt1330 Unit 3 Assignment 1-3

Open Document